Market Forge Industries M24E Installation, Operation And Maintenance Manual

Me series
Hide thumbs Also See for M24E:

Advertisement

Quick Links

INSTALLATION - OPERATION - MAINTENANCE
44 Lakeside Avenue, Burlington, Vermont 05401 USA
Telephone: (802) 658-6600 Fax: (802)864-0183
www.mfii.com
ME SERIES
ELECTRICALLY OPERATED BOILERS
MODELS
‰ M24E
‰ M36E
© 2015 - Market Forge Industries Inc.
PN 14-0309 Rev C (12/15)

Advertisement

loading

Summary of Contents for Market Forge Industries M24E

  • Page 1 ME SERIES ELECTRICALLY OPERATED BOILERS INSTALLATION - OPERATION - MAINTENANCE MODELS ‰ M24E ‰ M36E 44 Lakeside Avenue, Burlington, Vermont 05401 USA Telephone: (802) 658-6600 Fax: (802)864-0183 www.mfii.com PN 14-0309 Rev C (12/15) © 2015 - Market Forge Industries Inc.
  • Page 2 Your Service Agency’s Address: Model Serial number Boiler installed by Installation checked by...
  • Page 3: Table Of Contents

    TABLE OF CONTENTS IMPORTANT WARNING: Improper installa- INSTALLATION tion, adjustment, alternation, Introduction ............. . 2 service or maintenance can cause property damage, in- Assembly .
  • Page 4: Installation

    Introduction To the Kitchen Manager: THEORY OF OPERATION FOR ELECTRIC BOILER: 1. Read this manual carefully and in its entirety. Contact An explanation of how the control system operates on au- Market Forge Ind., Inc. for clarification if necessary. tomatic electric boilers follows: With the boiler filled with water to the proper level and the 2.
  • Page 5: Assembly

    Assembly RECEIVING INSTRUCTIONS: INSTALLING LEGS: Inspect the equipment before signing the bill of lading. Some models are shipped without legs. A separate carton The equipment supplied was tested and inspected before will contain the legs. If your model is received this way, shipment.
  • Page 6: Service Connections

    Service Connections ELECTRICAL REQUIRMENTS DIMENSIONS ARE IN INCHES [MM] Volts Phase 24kW 36kW 42kW 48kW 24 [610] M24E 208 (197-219) 36 [914] M36E 240 (220-240) 4 [102] 480 (360-500) 2.5 [64] Details of other electrical systems available upon request. SERVICE CONNECTIONS 10.5...
  • Page 7: Operation

    Operating Instructions OPERATING INSTRUCTIONS FOR STEAM BOILERS to ON. When the Low Water light goes off, the Green indicator light will come ON. (This is necessary to Be sure to check that manually reset the unit). 1. ON-OFF switch is in the off position. 4.
  • Page 8: Maintenance

    Cleaning the Boiler CLEANING INSTRUCTIONS Market Forge recommends that the boiler be cleaned pe- riodically due to impurities introduced through the water 1. Move the heat and power switch to their OFF posi- supply. All water supplies contain some mineral deposits tions.
  • Page 9 Cleaning the Boiler Figure 4 4. Remove the front cover with elements (C) “Figure 4” REPLACEMENT PARTS NEEDED TO COMPLETE as follows: Using a 1/4” socket head wrench, back off THESE INSTRUCTIONS the (9) Hex-Nuts, counterclockwise. Description Part No. 5. Clean rust, scale and lime deposits from the inside of Front Cover Gasket 98 - 1673 the boiler with a wire brush.
  • Page 10 Cleaning the Boiler APPLYING TOTAL CONCEPT DESCALER Total Concept is designed to be used with water between 160°F to 200°F. Preheating is required on the boiler to raise the water temperature to the acceptable range. (160°F to 200°F). Total Concept is a NSF listed nonfood product. This is a liquid acid (nonmuriatic) product that works without fumes, odors, and hazards associated with other harsh chemicals.
  • Page 11 Cleaning the Boiler 7. Remove the plug from the access port on the steam 10. When empty, refill the container with hot tap water header pipe inside cabinet doors. and add to boiler for cleaning. Repeat twice. This ad- ditional 2 gallons of water will cause the low water probe to be immersed in cleaner/descaler solution.

This manual is also suitable for:

M36e