Installation - Potterton Promax System HE Installation And Servicing Instructions

Wall mounted powered flue condensing boiler gas fired central heating unit
Hide thumbs Also See for Promax System HE:
Table of Contents

Advertisement

Fig. 20
Wall Thickness
Flue Hole ø
up to 227mm
125mm core drill
up to 750mm
150mm core drill
up to 1200mm
175mm core drill
Plastic Flushing Tube
Fig. 21
Fixing Template
NOTE : FOR EACH 1m OF HORIZONTAL FLUE ADD 55mm OF CLEARANCE ABOVE THIS LINE
37mm
CENTRE FOR DIA.150mm (6") HOLE
WALL THICKNESS UPTO 227mm (9")
CENTRE FOR DIA. 125mm (5") HOLE
CENTRE FOR DIA. 125mm (5") HOLE
TO 750mm (30")
WALL THICKNESS UPTO 227mm (9")
WALL THICKNESS UPTO 227mm (9")
PROMAX SYSTEM HE
BOILER
MINIMUM CLEARANCE 5mm EACH SIDE
GENERAL AREA FOR
ELECTRICAL SUPPLY
CONDENSATE
GAS
FLOW
SUPPLY
DRAIN

8.0 Installation

Check Site Requirements (section 7.0) before
commencing.
8.1
APPLIANCE OUTLINE
The gas supply, gas type and pressure must
be checked for suitability before connection
(see Section 7.6).
NOTE: If the boiler is to be pre-plumbed,
follow both these instructions and those on
the boiler pack.
1. Remove the fixing template (Fig. 20) from the
fixing carton.
2. After considering the site requirements
(see Section 7.0) position the template on the
wall ensuring it is level both horizontally and
vertically.
3. Mark the position of the top centre hole for the
wallplate.
4. Mark the condensate discharge pipe area.
5. Mark the centre of the flue hole (rear exit). For
side exit, mark as shown. If required, mark the
RETURN
PRESSURE
RELIEF
position of the gas and water pipes. Remove the
template.
6. Cut the hole for the flue (minimum diameter
FIXING TEMPLATE PART No. 5106702p
125mm) (see table opposite for wall thickness
flue diameter's).
7. Drill and plug the wall as previously marked.
Secure the wallplate to the wall by the top centre
hole.
8. Ensuring the wallplate is level both
horizontally and vertically, drill and plug the
remaining 4 securing positions at the top and
bottom through the wallplate. Utilising the slots
available ensure the wallplate is square and
secure to the wall.
9. Connect the gas, water and the pressure relief
discharge pipes to the valves on the support
bracket using the copper tails supplied. Ensure
the sealing washers are fitted correctly to the
water connections.
10. Loosely route the condensate discharge pipe
to the area previously marked.
8.2
1. Insert a tube into the valve outlet furthest from
the filling loop (Fig. 21).
2. Flush thoroughly (see System Details, Section
6.0).
Initial Preparation
Flushing
17

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Promax System HE and is the answer not in the manual?

Table of Contents