Upflow Installation - Trane AUX2B060A9362A Installer's Manual

Table of Contents

Advertisement

Installer's Guide

UPFLOW INSTALLATION

Standoffs and screws (See Figure 1) are included with the
cased coils for attachment to the furnace. There are clear-
ance alignment holes near the bottom of the coil wrapper.
Drill screws are used to engage the furnace top flanges. The
standoff is inserted into the cabinet alignment hole. The drill
screws are inserted through the standoffs then screwed into
the furnace flange. The coil is always placed downstream of
the furnace airflow.
1
STANDOFFS (4)
STANDOFFS
(BOTH SIDES)
DOWNFLOW INSTALLATIONS
2
WARNING
!
Do not install the furnace directly on carpeting, tile or other
combustible material other than wood flooring. For
vertical downflow application, subbase (BAYBASE205)
must be used between the furnace and combustible
flooring. When the downflow furnace is installed vertically
with a cased coil, a subbase is not required.
Required floor opening: (DOWNFLOW)
See Figure 3 and Table 1
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
3
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
FURNACE
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
FRONT
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
6
DRILL SCREWS (4)
FOR VERTICAL
SCREWS
(BOTH SIDES)
A (width)
B (depth)
D
C
TABLE 1
FLOOR OPENING PLENUM OPENING
CABINET
RETURN
WIDTH
DUCT WIDTH
14-1/2"
13-1/4"
13-5/8"
17-1/2"
16-1/4"
16-5/8"
21"
19-3/4"
20-1/8"
24-1/2"
23-1/4"
23-5/8"
HORIZONTAL INSTALLATION
The coil and furnace must be fully supported when used in
the horizontal position. It is always recommended that an
auxiliary drain pan be installed under a horizontally in-
stalled evaporator coil or 90% gas furnace. Connect the
auxiliary drain line to a separate drain line (no trap is
needed in this line).
Three brackets (with screws) are included with downflow
furnaces for installation to stabilize and secure the furnace
and TXC cased coil in the horizontal position. See Fig-
ure 4.
4
CASED COIL CONNECTION
BRACKET FOR DOWNFLOW
FURNACE IN HORIZONTAL
DOWNFLOW ONLY
IMPORTANT:
The 2/4TXC cased coil must be placed downstream of the
furnace. In horizontal installations, the apex of the coil
may point either toward or away from the furnace. See
the 2/4TXC coil Installer's Guide for more details.
The cased coil is secured to the furnace and both the furnace
and the cased coil must be properly supported. The brackets
mount using the rear screws on the coil case and use the
screws provided to secure the bracket to the furnace. The
remaining bracket is placed as close to center as possible
(horizontally) between the coil case front and the furnace
bottom channel (for downflow/horizontal furnace). Use four of
the screws provided to secure the bracket. The upflow furnace,
converted to horizontal, aligns and attaches the TXC coil as in
Figure 1. However, the coil requires additional support.
The furnace may be installed in an attic or crawl space in the
horizontal position by placing the furnace on the left side (as
viewed from the front in the vertical position). The horizontal
furnace installation in an attic should be on a service plat-
form large enough to allow for proper clearances on all sides
and service access to the front of the furnace (See Figure 5 &
Clearance Tables, pages 4-5). Line contact is only permis-
sible between lines formed by intersections of the top and two
sides of the furnace casing and building joists, studs, or
framing.
The furnace may be placed horizontally in a crawl space on a
pad or other noncombustible material which will raise the
unit for sufficient protection from moisture.
5
"A"
"B"
"C"
20-1/8"
12-5/8"
19-3/8"
20-1/8"
15-5/8"
19-3/8"
20-1/8"
19-1/8"
19-3/8"
20-1/8"
22-5/8"
19-3/8"
UPFLOW/
HORIZONTAL
SHOWN WITH
DIRECT VENT
18-CD19D8-18
"D"

Advertisement

Table of Contents
loading

Table of Contents