Lay-Up And Fitting Out; Chapter Four; Lay.upandfitt1Ngout - Yanmar 1GM10 Shop Manual

Hide thumbs Also See for 1GM10:
Table of Contents

Advertisement

LAY-UP
Boats that are stored for more than a month require
careful preparation for the lay-up. This is necessary to
prevent the engine from freezing. A thorough service will
also minimize damage from corrosion or fuel system con-
tamination. Begin the service, if possible, while the boat
is still in the water.
If the boat has been removed from the water, a supply of
cooling water must be made available to the engine. This
can be accomplished using a water hose attached to the
water pump inlet. Always start the water flow before
starting the engine.
Some of the following steps require water
for the cooling system. The boat must be in
the water, or a source of water must be con-
nected to the seawater cooling pump.
NOTE
Except where specified, F and D series en-
gines are included when a basic model num-

Chapter Four

Lay-up and Fitting
Out
ber is specijied. For example, ifmodel 3GM
is called out in a procedure, the procedure
also applies to 3GMD and 3GMF.
1. Run the engine until it reaches normal operating tem-
perature.
2. Change the engine oil and filter as described in Chapter
Three.
3. Use a suitable engine fogging oil as instructed by the
oil manufacturer.
4. Thoroughly inspect the engine, including the cooling
and fuel systems. Perform service work that will protect
against damage during extended storage, such as replac-
ing hoses and gaskets. Make a list of problems that should
be corrected before the boat is returned to service.
5. If the engine is equipped with freshwater cooling, flush
and change the freshwater coolant as described in Chapter
Three.
6. Drain the seawater cooling system as described in this
chapter. Be sure to drain or blow out all portions of the
system.

Advertisement

Table of Contents
loading

Table of Contents