Dell PowerEdge C8000 Getting Started page 13

Hide thumbs Also See for PowerEdge C8000:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Populate the System
CAUTION:
To ensure proper operation and cooling, all bays in the enclosure must
be populated at all times with either a sled or with a sled blank.
Install all components into the server enclosure.
To install a C8220 single-wide compute sled, slide the new sled into the
enclosure until the sled is fully seated and the release latch snaps into
place.
To install a C8220X double-wide compute sled, slide the new sled into
the enclosure until the sled is fully seated and the release latch snaps
into place.
To install a C8000XD storage sled, slide the new sled into the enclosure
until the sled is fully seated and the release tab snaps into place.
To install a power sled, slide the new sled into the enclosure until the sled
is fully seated and the release latch snaps into place.
To install a sled blank, slide the blank into the enclosure until it is fully
seated and the release latches snap into place.
Getting Started With Your System
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Poweredge c8220Poweredge c8220xPoweredge c8000xd

Table of Contents