Trip Level.(Low Volts) Calibration; Grade Potentiometer Calibration; Post-Maintenance Procedure - Quinton Q55 Service Manual

Medical
Hide thumbs Also See for Q55:
Table of Contents

Advertisement

5.4.3
Trip Level (Low Volts) Calibration
This
procedure
is
included
to
provide
information about the setting of trip level
potentiometer 2AIR23.
This potentiometer
should not require resetting once it has been
set at the factory.
1.
Unplug the treadmill and remove the
handrail and hood.
2.
Hook
the
treadmill
up
to
a
Variac
autotransformer that can provide at least 10%
less than operating voltage (for 230V, use
207V; for 208V, use 187Vj for 115V, use 103V).
WARNING
I
Do
not
wear
loose
clothing
around
rotating
machinery.
High
voltage
is
present
when
the
treadmill cable
is
plugged in.
3.
Turn the drive motor on at 1-3 mph or 2-5
kph.
4.
Turn
the
screw
at
trip
level
potentiometer 2AIR23 on the PCB so that the
LO VOLTS LED on the PCB just barely comes
on.
5.
Unplug the treadmill from the Variac
autotransformer and replace the handrail and
hood.
5.4.4
Grade Potentiometer Calibration
This procedure may be performed wi th the
hood and handrail already re moved and power
on, provided caution is exercised.
1.
Take treadmill grade to approximately
12% (6-7
0 ).
2.
Unplug the treadmill, remove the hand-
rail and lift the hood straight up off the
treadmill.
3.
Turn the sprocket on the pinIOn shaft
toward the drive motor until the grade reading
is 8-10% (5-6
0 ).
WARNING
I
Do
not
wear
loose
clothing
around
rotating
machinery.
High
voltage
is
present
when
the
treadmill
cable is
plugged in.
4.
Restore
power
to
the
treadmill and
decrease the grade to minimum. Verify that
the torque limiter is slipping and that the
grade is level.
The grade potentiometer is
now set at zero.
5.
Calibrate grade (Section 5.4.2).
5.5
POST ·MAINTENANCE PROCEDURE
The checkout procedure provided in Section
2.4 can be performed to verify that the
Q55/Q65
treadmill
is
operable
following
maintenance. If a more detailed procedure is
desired, the troubleshooting tree provided on
pages 4-2 through 4-5 can be used to perform
a checkout test.
5-15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Q65

Table of Contents