Download Print this page

System Checkout - Braeburn 140303 Installation Instructions Manual

Premier 3-zone
Hide thumbs Also See for 140303:

Advertisement

5. Set the DIP switches to meet system requirements.
Switch Label
1
Non-HP / Heat Pump
2
Normal / Dual Fuel
3
Rev Valve B/O
4
Fan Gas / Elec & HP
5
Opp Call 20 / 15
6
Lockout None / Active
7
Priority All / Zone 1
8
G2 W/2-Zones / 2 Stages
5

System Checkout

After the wiring and configuration is complete, use the following checklist to verify the panel operation is
correct.
[ ]
Make sure the Emergency Heat Switch is in the Off (right) position.
[ ]
Open jumper J2 by moving cap from both pins to only one pin.
[ ]
Use table and diagram in section 4 of this installer guide or inside the zone panel cover to
verify DIP switches are set properly.
[ ]
Make sure the supply temp sensor is wired to terminals SA1 and SA2. The zone dampers
will not close if the supply sensor is missing.
[ ]
Make sure no zones are calling by turning off all thermostats.
[ ]
Apply 24 VAC power to the panel.
Function
Conventional or heat pump control of W/Y
HP 1st stage lockout on 2nd stage call
O/B terminal active in heating (B position) or cooling (O position)
Fan controlled by HVAC system or panel
Opposite call answer time in minutes
2nd stage lockout without 2 zones calling
Changeover priority zone 1 or first call
2nd stage fan activation requires 2 zones or 2 stages
NON HP
NON HP
NORMAL
NORMAL
REV VALVE B
REV VALVE B
FAN GAS
FAN GAS
OPP CALL 20
OPP CALL 20
LOCKOUT NONE
LOCKOUT NONE
PRIORITY ALL
PRIORITY ALL
G2 W/2-ZONES
G2 W/2-ZONES
7
HEAT PUMP
HEAT PUMP
DUAL FUEL
DUAL FUEL
O
O
ELEC/HP
ELEC/HP
15
15
ACTIVE
ACTIVE
ZONE1
ZONE1
2-STAGES
2-STAGES

Advertisement

loading