Download Print this page

Curtis TLP10 Installation Instructions, Service & Warranty Information page 2

Digital airpot brewing system

Advertisement

F F F F F
IND OUT
IND
IND
OUT
OUT
OUT MORE
MORE
MORE
MORE
IND
IND
OUT
MORE
. . . . .
ON
ON THE
ON
THE
THE
THE WEB
WEB
WEB
WEB
ON
ON
THE
WEB
W I L B U R C U R T I S . C O M
W I L B U R C U R T I S . C O M
W I L B U R C U R T I S . C O M
W I L B U R C U R T I S . C O M
W I L B U R C U R T I S . C O M
Revised: Mar, 2002
MODELS INCLUDED
MODELS INCLUDED
MODELS INCLUDED
MODELS INCLUDED
MODELS INCLUDED
• • • • • TLP10
• • • • • TLP15
• • • • • TLP20
• • • • • TLP30*
• • • • • TLP61
* NOT UL LISTED
CAUTION: Please use
this setup procedure
before attempting to use
this brewer. Failure to follow the
instructions can result in injury
or the voiding of the warranty.
CAUTION: DO NOT
connect this brewer to
hot water. The inlet
valve is not rated for hot water.
IMPORTANT: This
equipment is to be
installed to comply with
the applicable federal, state, or
local plumbing and electrical
codes having jurisdiction.
WARNING: To avoid
scalding, do NOT
remove brew cone
while brew indicator light is
flashing.
IMPORTANT: The
brewcycle is adjusted
at the factory to fill a
standard 2.5 liter airpot with
2.2 liters of brewed coffee. The
duration of the brewcycle is set
between 2 minutes, 40 seconds
and 3 minutes.
C
ISO 9001 REGISTERED
WILBUR CURTIS COMPANY
Montebello, CA 90640
W W W W W
ILBUR
ILBUR
ILBUR
ILBUR
ILBUR
TLP Brewer Instructions
This appliance is designed for commercial use. Any servicing other than cleaning and maintenance should be performed by an
authorized Wilbur Curtis service center.
• Do NOT immerse the unit in water or any other liquid
• To reduce the risk of fire or electric shock, do NOT open top panel. No user serviceable parts inside. Repair should be
done only by authorized service personnel.
• Keep hands and other items away from hot parts of unit during operation.
• Never clean with scouring powders, bleach or harsh implements.
Conventions
Conventions
Conventions
Conventions
Conventions
W W W W W ARNINGS –
ARNINGS –
ARNINGS –
ARNINGS – T T T T T o help a
o help a
o help a
ARNINGS –
o help a
o help avoid personal injur
Important Notes/Cautions – from the factory
Important Notes/Cautions – from the factory
Important Notes/Cautions – from the factory
Important Notes/Cautions – from the factory
Important Notes/Cautions – from the factory
Sanitation Requirements
Sanitation Requirements
Sanitation Requirements
Sanitation Requirements
Sanitation Requirements
SYSTEM REQUIREMENTS
Water Source: 20 - 100 PSI (Minimum Flow Rate of 1 GPM)
• Electrical: See attached schematic for your model.
Setup Steps
The unit should be level (left to right and front to back), located on a solid counter top. Connect a water line from the water
filter to the brewer. (NOTE: Some type of water filtration device must be used to maintain a trouble-free operation). In areas
with extremely hard water, we suggest that a sedimentary and taste & odor filter be installed. These will prolong the life of your
brewing system and enhance coffee quality.
The National Sanitation Foundation requires the following water connection:
1. A quick disconnect or additional coiled tubing (at least 2x the depth of the unit) so that the machine can be
moved for cleaning underneath.
2. In some areas an approved backflow prevention device may be required between the brewer and
the water supply. (Check local plumbing codes).
1. A ¼ flare water inlet fitting has been supplied for water line connection. Use tubing sized sufficiently to provide a minimum
of 1.0 GPM,
2. Connect the unit to an appropriate electrical power circuit.
3. Turn on the toggle (STANDBY/ON) switch behind the unit. The heating tank will start to fill. When the water level in the tank
rises to the correct volume, the heating elements will energize automatically. With ADS Systems there is no danger of
element burnout caused by an empty tank.
4. Turn on the control panel by pressing the ON/OFF button.
5. The heating tank will require 20 to 30 minutes to reach operating temperature (200°F) as indicated by the READY-TO-BREW
indicator.
6. Prior to brewing, dispense 12 ounces of hot water through the hot water faucet.
7. Run brew cycle of at least 16 ounces to purge the water line of any air trapped in the lines after filling.
BREWING COFFEE
1
2
1. Place airpot in
2. Pour ground coffee
position, under the
into the brewbasket.
sprayhead.
Place a new filter in
the brewcone.
FOR THE LATEST SPECIFICATION INFORMATION GO TO WWW.WILBURCURTIS.COM
C C C C C
C C C C C
URTIS
URTIS
OMP
OMP
URTIS
URTIS
URTIS
OMP
OMPANY
OMP
void personal injur
void personal injur
void personal injury y y y y
void personal injur
3
3. Slide the brewcone
into position on
brew rails.
, I
, I
. . . . .
, I
, I
, I
ANY
ANY
NC
NC
ANY
ANY
NC
NC
NC
4
4. Wait until the READY-
TO-BREW light comes
on and then press the
desired BREW button.
The indicator light
above the selected
brew will begin flashing
when the brewcycle
starts.
1

Advertisement

loading

This manual is also suitable for:

Tlp15Tlp20Tlp30Tlp61