Completing The Console Installation (P30 And P10) - Precor TRM 800 Series Assembling And Maintaining Manual

Table of Contents

Advertisement

50
Completing the Console Installation (P30
and P10)
Before you complete the final installation steps, double-check
the connections you have made. Make sure that all cables are
fully and securely connected, and that any unneeded cables
are tied back properly.
To complete the installation:
1.
2. Tilt the control console backward (toward yourself) until
3. Insert four ¹ ₄-inch × ³ ₈-inch shoulder bolts through the
Assembling and Maintaining TRM 800-Series Treadmills
Feed any extra cable back into the treadmill fairing.
the tab on the top edge of its back plate slides along the
top edge of the console mount and the screw holes align
properly.
holes in the console mount and thread them into the holes
in the back plate on the console. Using a ³ ₁₆-inch hex
wrench, tighten the shoulder bolts completely.
Figure 29: Securing the console

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents