Eyepiece unit
Metering FPC unit
・ Attach the eyepiece unit (#B261) with 2 screws
(#631).
Attach the metering FPC unit (#B2008) and the
spring (#290) temporarily with 2 screws (#291).
#B2008
#631×2
FPC connections
#1026
②
#1025
#291×2
#290
#B261
#B1008
No slack
④
③
①
#B2163
- A14 ・
・ Position the metering FPC unit by following the
direction, then attach it lightly with screws (first
① , then ② ).
Give the screws ( ① and ② ) about 3.5 turns
counterclockwise.
Direction for
positioning
2 pieces of tape (#709)
Note: Slack here catches the
-
VBA10401-R.3623.A
①
②
rear body when it is
attached.