Before Starting; Cabinet Construction - Kenmore 79042603311 Installation Instructions Manual

30" dual fuel slide-in range
Table of Contents

Advertisement

Available languages

Available languages

Before Starting
Tools
you will need
For leveling legs and anti=tip brackets:
..:_._.:_._._:_.
.... ._..\
• Adjustable wrench or channel lock pliers
>Y'<?
• 5/16" Nutdriver or Flat Head Screw
Driver
o Electric Drill & 1/8 Diameter
Drill Bit (5/32" Masonry Drill
Bit if installing in concrete)
o Level & Measuring Tape
For gas supply
connection:
• Pipe Wrench
• Brush
For burner flame adjustment:
• Phillips head _
and blade-type
screwdrivers
For gas conversion
(LP/Propane
or Natural):
o Open end wrench - 1/2" _: . ....
JP
Additional
materials
you will need:
o Gas line shut-off valve
o Pipe joint sealant that resists action of LP/_u---_i-M=_
Propane gas
<\ -s_Nt_L]
o A new flexible metal appliance conduit
(½" NPT x ¾" or ½" I.D.) must be design
certified by CSA International.
Because
solid pipe restricts moving the range we
recommend
using a new flexible conduit
(4 feet length) for each new installation
and additional reinstallations.
o Always use the (2) new flare union
adapters ½" NPT x ¾" or ½" I.D.) supplied
with the new flexible appliance conduit for
connection of the range.
|
Cabinet
Construction
_
To eliminate the risk of cabinet
burns and fire, do not have cabinet storage space
above the range. If there is cabinet storage space
above range, reduce risk by installing a range hood
that projects horizontally a minimum of 5" (12,7 cm)
beyond the bottom of the cabinet.
Countertop
Preparation
• The cooktop sides of the range fit over the cutout
edge of your countertop.
• If you have a square finish (flat) countertop,
no
countertop
preparation
is required. Cooktop sides lay
directly on edge of countertop.
• Formed front-edged
countertops
must have molded
edge shaved flat 3/4" (1,9 cm) from each front corner
of opening (Figure 1).
• Tile countertops
may need trim cut back 3/4"(1,9 cm)
from each front corner and/or rounded edge flattened
(Figure 1).
,9 cm)
Cutout
p_/;_"_..._
Width
I _ _"
'-
_/
311A,,_
_/
(80cm)
Formed or tile countertop
trimmed ¾" (1,9 cm) back at front
corners of countertop opening.
(1,9cm)
I
Figure
1
If the existing cutout width is greater than
30-1/16" (76,4 cm), reduce the ¾" (1,9 cm)
dimension.
Countertop
must be level. Place a level on the
countertop, first side to side, then front to back. If
the countertop
is not level, the range will not be
level. The oven must be level for satisfactory
baking
results. Cooktop sides of range fit over edges of
countertop opening.
I]_
Gas Entry
Preparation
• The hatched areas are the locations where the gas
line can enter the cabinet (Figure 2).
• The recommended
position for the gas entry line is
located at 4½" from the left cabinet wall and 3" from
the floor (figure 2).
• The wall shaded area is the location where the
electric junction box can be installed (read section 4).
Recommended
gas
__line entry positions
/
//
/
/,
Note: All dimensions
are in inches.
Figure 2
,\
\\

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

790426033107904261331079042613311

Table of Contents