Point-To-Point Measures List And Operating Sequence - Alcatel-Lucent 1850 TSS-320 Turn-Up And Commissioning Manual

Transport service switch
Hide thumbs Also See for 1850 TSS-320:
Table of Contents

Advertisement

Tests and Measurements
............................................................................................................................................................................................................................................................

Point-to-point measures list and operating sequence

Description
The aim of point to point measures is to check the whole link including the line.
If alarms and/or errors are detected and if all the local checks have been made, then the
failure is due to external causes. If local checks have not been executed proceed as
instructed in para.3.3 from page 32.
In this section, the following are detailed:
Rx optical "line port" power check
Optical "line port" link margin
Point to point error-monitoring check
Rx Optical "line port" power check
Purpose
Verify the optical power of the signal received from the remote 1850 TSS-320 (Station
B on the test bench).
Test instruments [see
Craft Terminal (E)
Power Meter B)
............................................................................................................................................................................................................................................................
PN 8DG08136CAAA
Issue 1 March 2008
Table 3-1, "Instruments" (p.
Point-to-point measures list and operating sequence
3-2)]