6 Installation details
6.1 Wrench torque sheet for installation
Outside diameter
mm
φ6.35
φ9.52
φ12.7
6.2 Connecting the cables
The power cord of connect should be selected according to the following specifications sheet.
Unit
FSArt-70HF
2
mm
3x1,5
Communication wire between the indoor and outdoor unit:
Unit
FSArt-70HF
2
mm
5x1,5
6.3 Pipe length and the elevation
Capacity
Btu/h
GAS
3/8'' (φ9.52)
7k~12K
1/2'' (φ12.7)
18K
1/2'' (φ12.7)
Caution:
Capacity is base on standard length and maximum allowance length is base of reliability.
Oil trap should be install per 5-7 meters, but not definitely needed.
Torque
inch
Kg.m
1/4
1.8
3/8
4.2
1/2
5.5
FSArt-90HF
FSArt-120HF
3x1,5
3x1,5
FSArt-90HF
FSArt-120HF
5x1,5
5x1,5
Pipe size
LIQUID
1/4'' (φ6.35)
1/4'' (φ6.35)
1/4'' (φ6.35)
FSArt-180HF
3x2,5
FSArt-180HF
5x2,5
Standard
Max.
length
(m)
Elevation
B (m)
5
8
5
8
5
10
In case that more
than 8m.
15
Max.
Additional
Elevation
refrigerant
A (m)
(g/m)
20
30
20
30
25
30