Boiler Location - Biasi SG 2 Manual And Installation Instructions

Sg series boiler
Table of Contents

Advertisement

Biasi SG Series
The following are the minimum clearance to construction or combustible materials:
1. 9" from the top, sides, and rear of the boiler.
2. 18" from the flue pipe in any direction.
3. 24" inches from the front of the boiler.
The boiler must be located on a non-combustible floor. A smooth, level concrete
floor is recommended. Locate the boiler as close as possible to the chimney. If boiler is
installed on combustible flooring, consult local authorities for proper method of covering
floor. The boiler must not be installed on carpeting.
Caution: Do not store or use flammable materials, chemicals or flammable
liquids, especially gasoline, in the vicinity of this heating appliance.
If the boiler is to be installed in "direct vent" configuration, please refer
to the QHT Direct Vent Addendum supplied with the Direct Vent Kit.
PROVISIONS FOR COMBUSTION AIR AND VENTILATION AIR MUST BE IN
ACCORDANCE WITH SECTION 5.3, AIR FOR COMBUSTION AND VENTILATION,
OF THE NATIONAL FUEL GAS CODE, ANSIZ223.1, OR APPLICABLE PROVISIONS
OF THE LOCAL BUILDING CODES. DO NOT INSTALL THE BOILER UNTIL
PROPER COMBUSTION AIR HAS BEEN ARRANGED.
Boiler is certified as an indoor appliance. Do not install boiler outdoors or locate where it will
be exposed to freezing temperatures

3. Boiler Location

DANGER
WARNING
Page 9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sg 7

Table of Contents