Fig. 39
FUNCTION INTERRUPTION
• If the De-aeration is interrupted due to a fault the pump will
cease to circulate but the function timer (approx.10 minutes)
will continue to run. For this reason it is recommended to
monitor the boiler display during De-aeration. If the fault
cannot be rectified quickly the function must be restarted to
ensure complete De-aeration.
• In the event of a loss of power the De-aeration function
needs to be restarted once the power is re-established.
• In the event of low water pressure the fault code E118 will
be displayed, along with the flashing
This error can be rectified by repressurising the system to at
least 1.0 bar. The pump will restart automatically once the
water pressure is successfully re-established and
reappear in the display.
• The De-aeration function can be repeated as necessary
until all air is expelled from the system.
Flue Sampling
Point
Plug
Analyser Probe
After refitting the sampling
point plug ensure there is no
leakage of products
7219708 - 01 (04/15)
R
/R
+
+
These buttons for
De-Aeration
and
symbols.
R
/R
/P
+
+
These buttons for
'Chimney Sweep'
EcoBlue
7.3

Commissioning Procedure

7.3.1

De-Aeration Function

The display backlight remains lit approx. 10 minutes. If
the backlight goes out during commissioning it does not
mean that the process has been completed.
This procedure MUST be carried out !
1. Ensure the gas is turned Off! Turn the power to the boiler ON.
The software version will be displayed, followed by
flashing briefly before displaying the 'Standby' symbol
2. Press
until
is briefly displayed followed by
3. The De-Aeration Function is now activated. The boiler pump
will run for approx. 10 minutes. During this time the pump will
alternate on and off and the diverter valve will switch between
heating & hot water to purge air from the system.
4. At the end of the process the boiler will return to the 'Standby'
position.
7.4

Gas Settings

7.4.1
Checking Combustion - 'Chimney Sweep' Mode
The case front panel must be fitted when checking combustion.
will
Ensure the system is cold & the gas supply turned on & purged.
The person carrying out a combustion measurement should
have been assessed as competent in the use of a flue gas analyser
and the interpretation of the results. See Section 10.1.3.
Important: Allow the combustion to stabilise before inserting the
Combustion Analyser Probe into the Test Point. This will prevent
saturation of the analyser.
R
1. Press
is displayed briefly followed by
point (eg. ,
delay before the boiler fires.
2. To adjust the boiler input setting, press
and the current setting point will flash (eg. ,
or
= MAX. HEATING input,
4. The combustion (CO level & CO/CO
and recorded at MAXIMUM DHW input & MINIMUM input.
5. Follow the flow chart on the next page to comply with the
requirement to check combustion on commissioning.
EcoBlue
The system MUST be cold to ensure the boiler is operating
under full demand. To obtain an accurate measurement on
smaller capacity systems it may be necessary to open one
or more hot taps and remove the diverter valve motor in
order to maintain the boiler output.
R
6. Press
7. Press the
8. Use the
settings to activate the required modes.
&
together and hold for at least 6 seconds
&
together and hold for at least 6 seconds.
or
) flashing alternately. Important: There may be a
button again to alter the boiler input setting.
= MAX. DHW input,
2
&
again for at least 6 seconds to exit.
R
once to bring the boiler out of 'Standby' mode.
button to toggle through the CH
Commissioning
7
, then ••
.
.
and the current setting
or
button
or
). Press the
= MIN. input
ratio) must be measured
and DHW
EcoBlue System
45

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents