Flushing; Connecting Diagrams; System Filling And Pressurising - Baxi EcoBlue System 12 Installation And Service Manual

Gas fired wall mounted condensing system boiler
Hide thumbs Also See for EcoBlue System 12:
Table of Contents

Advertisement

Fig. 18
7219708 - 01 (04/15)
Double
Stop
Stop
Check
Valve
Valve
Valve
Temporary
Loop
Cold
Mains
Inlet
5.5.3

Flushing

1. Flush thoroughly and treat the system according to guidance
given in B.S. 7593.
5.6

Connecting Diagrams

5.6.1

System Filling and Pressurising

1. A filling point connection on the central heating return pipework
must be provided to facilitate initial filling and pressurising and
also any subsequent water loss replacement/refilling.
2. The filling method adopted must be in accordance with all
relevant water supply regulations and use approved equipment.
3. Your attention is drawn to:
for GB: Guidance G24.2 and recommendation R24.2 of the Water
CH
Regulations Guide.
Return
for IE: the current edition of I.S. 813 "Domestic Gas Installations".
4. The sealed primary circuits may be filled or replenished by
means of a temporary connection between the circuit and a
supply pipe, provided a 'Listed' double check valve or some other
no less effective backflow prevention device is permanently
connected at the inlet to the circuit and the temporary connection
is removed after use.
Before Installation
5
EcoBlue System
37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents