Fitting Side Infill Panels - Potterton PROFILE LPG 100e Installation And Servicing Instructions

Fanned balanced flue gas fired boiler
Hide thumbs Also See for PROFILE LPG 100e:
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS - Page 17
FIG. 24 ROUTING OF ELECTRICAL WIRING
Following the pump manufacturer's instructions connect the
pump supply wires to terminals marked PUMP L,N, -on the
boiler terminal block. Route the cable through the plastic
bush in the rear of the control box as illustrated in FIG. 24
and secure, using the cable clamp.
Route a four core cable through the plastic bush in the rear
of the control box and the cable clamp as illustrated in FIG.
24 and connect it to the boiler input terminals as follows:-
Fully Pumped Systems.
Permanent live to terminal marked MAINS 'L'.
Neutral to terminal marked MAINS 'N'.
Earth to terminal marked
See NOTE.
Switched live from external controls to terminal marked
MAINS 'SwL'.
If there are no external controls fitted connect the SwL
terminal to permanent live in the junction box.

FITTING SIDE INFILL PANELS

If required, the gap between the casing sides and rear wall
can be closed off using the infill panels supplied.
Minimum or maximum rear boiler clearance is catered for by
turning the Infill panel. Attach each infill panel to the rear of
the boiler using two pieces of magnetic strip and an edge
clip (accessory pack G) positioned as illustrated.
Supplied By www.heating spares.co Tel. 0161 620 6677
adjacent to cable clamp.
Gravity Domestic Hot Water/Pumped Central Heating
Systems
Switched live from external gravity domestic hot water
control circuit to terminal marked MAINS 'SwL'.
Switched live from external pumped central heating control
circuit to terminal marked MAINS 'L'.
Neutral to terminal marked MAINS 'N'.
Earth to terminal marked
See NOTE.
If there are no external controls fitted connect the SwL
terminal to permanent live in the junction box.
NOTE:
Ensure that the earth conductor is longer than the L, N &
SwL from the point of anchorage, so that the current carrying
conductors become taut before the earth conductor if cable
is pulled out of the cable clamp. When the wiring has been
completed close the control box and replace the securing
screw.
adjacent to cable clamp.
Publication No. 559876/0296

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents