Download Print this page

Installation Instructions Page - Potterton PRIMA 30C User Manual

Open flue gas fired boiler

Advertisement

INSTALLATION INSTRUCTIONS - Page 13
It is the law that all gas appliances are installed and serviced
by competent persons as stated in the Gas Safety
(Installation and Use) Regulations 1994.
Electrical installation and servicing should be carried out by
a competent person in accordance with the I.E.E. Wiring
Regulations
For Health and Safety information see back page.
The boiler and its associated equipment will arrive on site in
one cardboard carton. The contents of the carton is as
follows:-
Figure 7 TEMPLATE
Place template in proposed boiler position taking due
account of the information given previously and the position
of the flue, (the minimum side clearances are automatically
allowed for). Refer to page 5 for top and bottom clearances
which can be measured from the template. Ensure that the
template is level and mark hole positions 'B'.
If the flue is to rise through the ceiling, mark out centre line
of hole for flue by extending the dotted line on template
vertically and measure out 158mm from rear wall as
illustrated.
Boiler
Template
Boiler Mounting Plate
Literature Pack containing:
Installation & Servicing Instructions
Users Instructions
Control System Pipework and Wiring Guide
Auxilliary Pack containing
Gas Service Cock
Accessory Packs
Adjustment screws
Figure 8 SECURING BOILER
MOUNTING PLATE
Remove template and drill holes 'B' to a depth of 50mm
using a 7mm drill. Cut hole through wall or ceiling as
necessary for intended run of flue pipe.
Using wall plugs, screws and washers (accessory pack A)
attach boiler mounting wall plate to wall ensuring that it is
level.
13

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Prima 50cPrima 60cPrima 40c