Temperature Rise Chart - Lochinvar 000 - 500 Installation And Service Manual

Hydronic heating boilers and domestic water heaters 45,000 - 500,000 btu/hr
Table of Contents

Advertisement

10. Start the boiler according to the
in this manual. Operate the system,
including the pump, boiler and radiation units, for
one hour.
11. Recheck the water level in the expansion tank. If
it exceeds half the tank volume, open the tank to
reduce the water level. Recheck pres sure charge
on diaphragm type tanks.
12. Shut down the entire system and vent all ra di a tion
units and high points in the system.
13. Close the water makeup valve and check the
strainer and pressure reducing valve for sediment
or debris. Reopen the water makeup valve.
14. Verify system pressure with the boiler pres sure
gauge before beginning regular operation.
15. Within three days of start-up, recheck and bleed all
air vents and the expansion tank using these
instructions.
Btu/hr
Input
Output
45,000
36,900
75,000
61,500
90,000
73,800
135,000
110,700
180,000
147,600
215,000
176,300
260,000
213,200
315,000
258,300
360,000
295,200
399,999
327,180
500,000
410,000
TABLE - N
SYSTEM TEMPERATURE RISE CHART
Based on Boiler Output in Btu/hr
10°F
T
20°F
GPM
Ft/hd GPM
7.4
0.6
3.7
12.3
1.3
6.2
14.9
1.4
7.4
22.3
3.2
11.1
29.7
5.1
14.9
--
--
17.0
--
--
21.5
--
--
26.0
--
--
29.7
--
--
33.0
--
--
--
INSTALLATION WITH A CHILLED
WATER SYSTEM
EXPANSION
TANK
LOW WATER
FLOW SWITCH
OUT
IN
GAS
SUPPLY
BOILER
FIG. 47 Installation with a Chilled Water System
Pipe refrigeration systems in parallel. Install duct coil
downstream at the cooling coil. Where the hot water
heat ing boiler is connected to a heating coil located in
the air handling units which may be ex posed to
re frig er a tion air circulation, the boiler pip ing system
must be equipped with flow control valves or other
automatic means to prevent gravity circulation of the
boiler wa ter during the cooling cycle. The coil must be
vented at the high point and hot water from the boiler
must enter the coil at this point. Due to the fast heating
capacity of the boiler, it is not necessary to provide a
ductstat to delay circulator operation.
ther mo stat flow checks as the boiler is cold when
heating ther mo stat is satisfied. This provides greater
econ o my over maintaining standby heat.
T
30°F
T
Ft/hd
GPM
Ft/hd GPM
0.2
2.5
0.2
0.4
4.1
0.3
0.5
5.0
0.3
1.2
7.4
0.6
1.6
9.9
0.7
1.3
11.8
0.8
2.1
14.3
0.9
4.1
17.3
2.2
5.4
19.8
2.5
8.1
22.0
3.6
--
27.6
6.6
37
HEATING AND
COOLING COIL
PUMP
CHILLER
WATER
SUPPLY
Also, omit
40°F
T
50°F
Ft/hd GPM
1.9
0.2
--
3.1
0.2
--
3.7
0.2
--
5.6
0.3
--
7.4
0.4
--
8.9
0.4
--
10.7
0.5
--
13.0
1.3
--
14.9
1.5
--
16.5
2.0
13.2
20.7
3.5
16.6
T
Ft/hd
--
--
--
--
--
--
--
--
--
1.7
2.1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents