Checking The Event Logs; Checking The Terminals - Samsung RES 3.6 kWh All In One User Manual

Sdi energy storage system
Table of Contents

Advertisement

Maintenance for Problem Solving
Use a torque screwdriver of 1.3-1.6 Nm and tighten the screws to attach the side cover.
4.

6.3 Checking the Event Logs

You can check the event messages on the website (https://myess.samsungsdi.com) and
identify various causes of the event message described in the following chapter (Chapter 7)
to perform a correct measure. Regarding a significant message, contact the designated
installer or the maintenance company for customer service.

6.4 Checking the Terminals

36
High voltages during operation can cause lethal damage to the human body
if the terminals are touched. Please disconnect the product from the voltage
sources (PV, AC grids).
Ensure that PV connection cables on the PV1+, PV1- and PV2+, PV2- are
fastened.
Check for corrosion on the terminals. If corrosion is seen, please contact the
installer.
Ensure that AC cables in AC1 and AC2 are fastened.
WARNING
Australia (Eng.) 05/2015. Rev1.1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Elsr362-00004

Table of Contents