Conversion To Other Gas Types - Wolf CGG-1K-24 Installation And Operating Instructions Manual

Gas fired wall mounted boiler
Table of Contents

Advertisement

Readjusting the gas valve:
Carry out the nozzle pressure adjustment in the following
order:
- Remove transparent plastic cap
valve.
- Operate the boiler in emissions test mode (Pmax).
- Adjust the maximum pressure at nut
- Tightening increases the pressure.
- Releasing reduces the pressure.
- Pull the cable from the gas valve; the boiler goes to minimum
output (Pmin).
- Adjust the minimum pressure at screw
ver 6x1); during this adjustment, hold nut
- Tightening increases the pressure.
- Releasing reduces the pressure.
- Reposition plastic cap
- Reconnect the cable.
Remove the test equipment:
- Shut down the boiler and close the gas shut-off valve.
- Pull the hoses off and tighten the test nipple and the test
port. Open the gas shut-off valve.
Check test nipple
gas may escape, resulting in a risk of explo-
sion.
4. Identification:
Carry out the re-designation of the gas type in accordance with
the instructions supplied with the conversion kit.
3062087_1108

Conversion to other gas types

from the gas combination
(spanner size 10).
(Philips screwdri-
tightly.
.
for soundness, otherwise
31

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cgg-1k-28

Table of Contents