Existing Installations; Circulating Air Requirements - Nordyne SC Series Installation Instructions Manual

Single stage condensing gas furnaces
Hide thumbs Also See for SC Series:
Table of Contents

Advertisement

Winter Design
20
0
-20
*NOTE: Insulation thickness greater than 3/8 inch, based on an
R value of 3.5 (ft x F x hr) / (BTU x in.)

Existing Installations

When an existing furnace is removed from a vent system
serving other appliances, the existing vent system may
not be sized properly to vent the remaining appliances
(For example: water heater). An improperly sized venting
system can result in the formation of condensate, leakage,
or spillage. The existing vent system should be checked
to make sure it is in compliance with NFGC and must be
brought into compliance before installing the furnace.
NOTE: If replacing an existing furnace, it is possible you
will encounter an existing plastic venting system that is
subject to a Consumer Product Safety Commission recall.
The pipes involved in the recall are High Temperature
Plastic Vent (HTPV).
recall does not apply to other plastic vent pipes, such
as white PVC or CPVC. Check for details on the CPSC
website or call their toll-free number (800) 758-3688.
The method for disposing of condensate varies according
to local codes. Consult your local code or authority having
jurisdiction. Neutralizer kit P/N 902377 is available for
use with this furnace.
This furnace has multiple options for positioning the vent
pipe as described in the, Vent and Inducer Assembly
Options section
(page
drain lines must be J-trapped using field supplied parts.
After the condensate lines are J-trapped, they may be
combined together when routed to the drain.
For Installations where there is limited clearance for the
J-Trap (such as an attic where it may be installed between
ceiling joists), either side of the J-Trap can be shortened
to a minimum of 3 Inches. See
14
45
70
20
70
10
60
Vent Protection
18). Each of the condensate
Figure 11 (page
16).

CIRCULATING AIR REQUIREMENTS

This
with the Standard for the Installation of Air Conditioning
and Ventilating Systems (NFPA No. 90A) or the
Standard for the Installation of Warm Air Heating and
Air Conditioning Systems (NFPA No. 90B).
Table 6 (page
35),
37), and
Table 9 (page 38)
airflow and temperature rise data for each furnace input
rate. If the maximum airflow is 1,600 CFM or more, it is
recommended that two openings be used for return air
on upflow furnaces. Downflow furnaces can only use
one return opening.
removable access panel. The opening should be
accessible when the furnace is installed in service and
shall be of a size that smoke or reflected light may be
observed inside the casing to indicate the presence of
leaks in the heat exchanger. The cover for the opening
shall be attached in a way that prevent leaks.
ventilation or to improve indoor air quality, the system
must be designed so that the return air is not less than
60° F (15° C) during operation. If a combination of indoor
WARNING:
Table 7 (page
36),
Table 8 (page
contain the maximum