Equipment Checklist - SMC Networks EZ Switch SMCGS10P-Smart Installation Manual

Web smart 10-port gigabit ethernet poe switch
Hide thumbs Also See for EZ Switch SMCGS10P-Smart:
Table of Contents

Advertisement

E
QUIPMENT
After unpacking this switch, check the contents to be sure you have received all
the components. Then, before beginning the installation, be sure you have all
other necessary installation equipment.
Web Smart 10-Port GE PoE Switch
Four adhesive foot pads
Grounding screw
Bracket Mounting Kit containing two brackets and eight screws for attaching
the brackets to the switch
Power Cord
This Installation Guide
Documentation CD (Includes Management Guide)
O
R
PTIONAL
E
QUIPMENT
If you plan to rack-mount or wall-mount the switch, be sure to have the
following equipment available:
Four mounting screws for each device you plan to install in a rack—these
are not included
A screwdriver (Phillips or flathead, depending on the type of screws used)
C
HECKLIST
-M
ACK
OUNTING AND
C
HAPTER
W
ALL
– 43 –
| Installing the Switch
3

Equipment Checklist

-M
OUNTING

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents