Mounting Instructions - Linear BGUS Installation Manual

Linear safety gate user manual
Table of Contents

Advertisement

MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE

MOUNTING INSTRUCTIONS

INSTALLATION ON CONCRETE CURB
1. Uncrate the gate. Avoid damaging the cabinet fi nish.
2. Leave the machine bolted to the bottom pallet until ready to
install.
3. Open the cabinet door.
4. Remove the bolts holding the gate to its pallet and place the
machine in position on the curb. Refer to your Equipment Layout
(EL) drawing for proper positioning of your gate.
5. With a pencil, mark the location of the mounting holes on the
concrete.
6. Set the gate aside. Drill all four mounting holes using a 3/4"
diameter rotary hammer percussion drill bit. Insert lag screw
anchors for 1/2" lag bolts. Place the gate back in position, and
anchor it with 1/2" lag bolts and fl at washers. Lubricate the
bolts before installation. Flat washers have been supplied to go
between pavement and cabinet. LINEAR highly recommends
using the corner mounting holes when mounting barrier
gates.
7. Proceed with the rest of the installation process.
BGUS/BGUS-D•SG/SG-D
-5-

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bgus-dSgSg-d

Table of Contents