Heatilator NDI30-C Owner's Manual page 26

Installation and operation
Hide thumbs Also See for NDI30-C:
Table of Contents

Advertisement

To prevent odors and cold air drafts, it may be necessary to
place non-combustible insulation or fi eld fabricated metal
plates around the vent pipe fl ues as they go through the
damper.
Note: The LINK-DV4-30B and LINKSQ-DV4-30 systems
REQUIRE this insulation.
Masonry
LINK-DV30B
LINKSQ-DV30
Installation*
TERMINATION
EXHAUST
AIR
VENT PIPE
INLET AIR
VENT PIPE
*LINK-DV30B/LINKSQ-DV30: This installation may perform better
and allow less cold air infi ltration in negative pressure settings.
**LINK-DV430B/LINKSQ-DV4-30:
• This installation may be more susceptible to cold air infi ltration and
the effects of negative pressure on the appliance's performance.
• Depending on the chimney cleanliness, consider using the
full length intake so as to lessen the possibility of sense rod
contamination and fl ame rectifi cation issues.
Figure 8.7
26
LINK-DV4-30B
LINKSQ-DV4-30
Installation**
CAP
EXHAUST
AIR
VENT PIPE
OR
Heatilator • NDI30-C, NDI30-SP, NDI35-C, NDI35-SP • 2226-901 Rev. S • 6/15
OPTIONAL LINK-ZC-ADPB
FOR USE WITH CLASS A
WOODBURNING PIPE
WARNING:
DO NOT BLOCK
THIS PIPE END!
Note: Untwist the
pipe while extend-
ing it, to achieve full
30' length.
Remove 18 inch x 18 inch fl ashing on cap by remov-
ing 3 screws. Connect both the LINK-ZC-ADPB to
INLET AIR
Class A Pipe and the termination cap to the LINK-
VENT PIPE
ZC-ADPB with the self tapping screws provided.
Factory Built
Wood Burning

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ndi30-spNdi35-cNdi35-sp

Table of Contents