Chapter 2 • Installation, Setup, Operation; Ul Requirements; Preparing The Site And Installing The Wall Box - Extron electronics CVEQ1 User Manual

1-input, 1-output equalizing composite video line drivers
Hide thumbs Also See for CVEQ1:
Table of Contents

Advertisement

im Vertrieb von
Installation, Setup, Operation

UL Requirements

The Underwriters Laboratories (UL) requirements listed below
pertain to the installation of the CVEQ1 WM and CVEQ1 AAP.
1.
These units are not to be connected to a centralized DC
power source or used beyond their rated voltage range.
The Extron P/S 100, P/S 150, and other Extron power
supplies may be used with the CVEQ.
2.
These units must be installed in UL listed junction boxes.
The UL approved electrical wall box (junction box) is not
included with the CVEQ; the installer is responsible for
obtaining and installing the box.
3.
These units must be installed with conduit in accordance
with the National Electrical Code.

Preparing the Site and Installing the Wall Box

Choose a location that will allow cable runs without
interference. Allow enough depth for both the wall box and
the cables. You may need to install the cables into the wall,
furniture, or conduits before installing the line driver.
• The CVEQ1 AAP can be installed in an Extron two-gang, four-
gang, or half rack width AAP Architectural Adapter Plate or in
the faceplate of another Extron device that accepts AAP plates,
such as an interface or distribution amplifier. Refer to the
mounting instructions for the adapter plate or device.
• The CVEQ1 WM can be installed in a standard one-gang elec-
trical wall box that is at least 2.5" deep. An optional one-gang
mounting bracket (mud ring) is also available.
The installation must conform to national and local electrical
codes and to the line driver's size requirements. A dimensional
drawing of the CVEQ1 WM and a template (not to scale) are
provided in appendix B of this manual.
1.
Cut out the center portion shown in the template that
corresponds to the wall box.
2.
Place the template (or the wall box) against the installation
surface, and mark the guidelines for the opening on the
wall or furniture.
3.
Cut out the material from the marked area.
4.
Check the opening size by inserting the wall box into the
opening. The box and the line driver's circuit boards and
connectors should fit easily into the opening. Enlarge or
smooth the edges of the opening if needed.
www.camboard.de
CVEQ1 Series • Installation, Setup, Operation
2-2
CAMBOARD Electronics
Installation Cable
Cable Clamp
Screws or Nails
Tel. 07131 911201
Fax 07131 911203
Connecting Shields.eps
5.
Feed cables through the wall box punch-out holes, and
secure them with cable clamps to provide strain relief.
6.
Exposed cable shields (braids or foil) are potential sources
of short circuits. Trim back and/or insulate shields with
heat shrink.
Cable Clamp
Install Cable
Foil Shield
Grounding outer braided and foil shields
To prevent short circuits, the outer foil shield can be
cut back to the point where the cable exits the cable
1-gang wall box.eps
clamp. Both braided and foil shields should be con-
nected to an equipment ground at the other end of
the cable.
7.
Insert the wall box into the opening, and attach it to the
wall stud or furniture with nails or screws, leaving the
front edge flush with the outer wall or furniture surface.
See the following illustration, which applies to one-, two-,
and four-gang wall boxes.
Wall Stud
Installation Cable
Cable Clamp
Screws or Nails
Attaching a wall box to a wall stud
ce-info@camboard.de
CVEQ1 Series • Installation, Setup, Operation
Metal Wall Box
Screw
Braided Shield
Wall Stud
2-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cveq1 aap

Table of Contents