Checklist - Carrier 58UHV Installation, Start-Up, And Operating Instructions Manual

Upflow/horizontal variable-speed, 2-stage induced-combustion gas furnaces sizes 060-120, series 100
Table of Contents

Advertisement

d. Close thermostat switch as if making normal furnace start.
If the hot surface ignitor does not glow within several
minutes and control flashes code 32, then the flow-sensing
switches are functioning properly.
e. Turn off 115-v power to furnace.
f. Reconnect inducer motor wires, replace gas control door,
and turn on 115-v power.

CHECKLIST

1. Put away tools and instruments, and clean up debris.
Packaged Service Training programs are an excellent way to increase your
knowledge of the equipment discussed in this manual, including:
A large selection of product, theory, and skills programs is available, using popular
video-based formats and materials. All include video and/or slides, plus companion
book.
Classroom Service Training plus "hands-on" the products in our labs can mean
increased confidence that really pays dividends in faster troubleshooting, fewer
callbacks. Course descriptions and schedules are in our catalog.
[ ] Packaged Service Training
SERVICE TRAINING
• Unit Familiarization
• Installation Overview
CALL FOR FREE CATALOG 1-800-962-9212
2. Check SW-1 through SW-4 after completing installation to
ensure desired settings for thermostat type (SW-1 and SW-2)
and blower-off delay (SW-3 and SW-4). Refer to Tables 6 and
7.
3. Verify manual reset switches have continuity.
4. Ensure blower and gas control access doors are properly
installed.
5. Cycle-test furnace with room thermostat.
6. Check operation of accessories per manufacturer's instruc-
tions.
7. Review User's Manual with owner.
8. Leave literature packet near furnace.
• Maintenance
• Operating Sequence
[ ] Classroom Service Training
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

58uxv

Table of Contents