Foam Tape: (410 litre storage tank only) – Retrieve the length of foam tape from the kit supplied with
7.
the 410 storage tank.
The foam tape is to be applied to the bottom at the front of the 410 litre storage tank.
The ends of the foam tape are to line up with the two vertical slots in the jacket.
The midpoint of the tape (lengthways) is to line up over the join between the jacket of the storage tank
and the jacket bottom.
Remove the backing from the foam tape and apply the foam tape to the storage tank.
FOAM
TAPE
REMOVE ADHESIVE
PAPER BACKING
FOAM TAPE APPLICATION HEAT PUMP INTEGRATED 410 LITRES
8.
Heat Pump Module: Remove all packaging including the carton base from the heat pump module and
position in its intended location at the storage tank.
CAUTION: The heat pump module weighs approximately 42 kg. Use the hand holes provided in the
sides of the packaging. Good lifting practice should be followed.
LINE UP EDGES OF FOAM
TAPE UNDER SLOTS.
Step 7
apply foam tape to 410 litre storage tank
29
HEAT PUMP AND TANK ASSEMBLY
MID POINT OF FOAM TAPE
TO LINE UP OVER JOIN
BETWEEN JACKET AND
JACKET BOTTOM.
SK6570-2 REV BD 30/4/13