Concentric Vent And Combustion-Air Termination Kit Installation - Carrier 58MVP Installation, Start-Up, And Operating Instructions Manual

4-way multipoise direct-vent variable-capacity condensing gas furnace for sizes 040—120, series 130
Table of Contents

Advertisement

b. Reposition combustion-air intake housing plug fitting in
appropriate unused intake housing connection.
c. Insert perforated disk assembly (factory supplied) in intake
housing where combustion-air intake pipe will be con-
nected.
d. Install pipe support (factory-supplied in loose parts bag)
into selected furnace casing combustion-air pipe hole. Pipe
support should be positioned to bottom of casing hole.
e. Insert 2-in. diameter pipe into intake housing.
NOTE: A 2-in. diameter pipe must be used within the furnace
casing. Make all pipe diameter transitions outside furnace casing.
f. Drill a 1/8-in. hole in 2-in. combustion-air pipe using hole
in intake housing as a guide.
g. Install a field-supplied No. 6 or No. 8 sheet metal screw
into combustion-air pipe.
NOTE: DO NOT OVERTIGHTEN SCREW. Breakage to intake
housing or fitting may cause air leakage to occur.
NOTE: Do not attach combustion-air intake pipe permanently to
combustion-air intake housing since it may be necessary to remove
pipe for service of ignitor or flame sensor.
COMBUSTION-AIR INTAKE HOUSING PLUG FITTING
The combustion-air intake plug fitting must be installed in
unused combustion-air intake housing. This fitting must be
attached by using RTV sealant, or by drilling a 1/8-in. hole in
fitting, using hole in intake housing as a guide. Install a
field-supplied No. 6 or No. 8 sheet metal screw.
NOTE: DO NOT OVERTIGHTEN SCREW. Breakage to intake
housing or fitting may cause air leakage to occur.
A plugged drain connection has been provided on this fitting
for use when moisture is found in combustion-air intake pipe
and combustion box.
NOTE: Moisture in combustion-air intake may be result of
improper termination. Ensure combustion-air intake pipe is similar
to that shown in Fig. 34, 35, 36, 37, or 38 so it will not be
susceptible to areas where light snow or other sources of moisture
could be pulled in.
If use of this drain connection is desired, drill out fitting's tap
plug with a 3/16-in. drill and connect a field-supplied 3/8-in.
tube. This tube should be routed to open condensate drain for
furnace and A/C (if used), and should be trapped. (See Fig.
33.)
3/8" ID TUBE
3/16"
DRILL
4"
MIN
TRAP
TO OPEN
DRAIN
→ Fig. 33—Intake Housing Plug Fitting Drain
2. Attach vent pipe as follows:
a. Determine location of vent pipe connection to inducer
housing as shown in Fig. 31 for application.
COMBUSTION – AIR
INTAKE HOUSING
BURNER
BOX
COMBUSTION –
AIR PIPE
b. Reposition neoprene inducer housing outlet cap and clamp
to appropriate unused inducer housing connection. Tighten
clamp.
Inducer housing outlet cap must be installed and fully seated
against inducer housing. Clamp must be tightened to prevent
any condensate leakage. Failure to follow this warning could
result in electrical shock, fire, personal injury, or death.
c. Install pipe support (factory-supplied in loose parts bag)
into selected furnace casing vent pipe hole. Pipe support
should be positioned to bottom of casing hole.
d. Insert 2-in. diameter pipe into inducer housing through
neoprene coupling and clamp in inducer housing. Tighten
clamp.
Vent pipe must be installed and fully seated against inducer
housing. Clamp must be tightened to prevent any condensate
leakage. Failure to follow this warning could result in
electrical shock, fire, personal injury, or death.
NOTE: A 2-in. diameter pipe must be used within the furnace
casing. Make all pipe diameter transitions outside furnace casing.
3. Working from furnace to outside, cut pipe to required
length(s).
4. Deburr inside and outside of pipe.
5. Chamfer outside edge of pipe for better distribution of primer
and cement.
6. Clean and dry all surfaces to be joined.
7. Check dry fit of pipe and mark insertion depth on pipe.
NOTE: It is recommended that all pipes be cut, prepared, and
preassembled before permanently cementing any joint.
8. After pipes have been cut and preassembled, apply generous
layer of cement primer to pipe fitting socket and end of pipe
to insertion mark. Quickly apply approved cement to end of
pipe and fitting socket (over primer). Apply cement in a light,
uniform coat on inside of socket to prevent buildup of excess
cement. Apply second coat.
9. While cement is still wet, twist pipe into socket with 1/4 turn.
Be sure pipe is fully inserted into fitting socket.
10. Wipe excess cement from joint. A continuous bead of cement
will be visible around perimeter of a properly made joint.
11. Handle pipe joints carefully until cement sets.
12. Support combustion-air and vent piping a minimum of every
5 ft (3 ft for SDR-21 or -26 PVC) using perforated metal
hanging strap.
13. Slope combustion-air and vent pipes toward furnace a mini-
mum of 1/4 in. per linear ft with no sags between hangers.
14. Use appropriate methods to seal openings where vent and
combustion-air pipes pass through roof or sidewall.
Step 3—Concentric Vent and Combustion-Air
Termination Kit Installation
NOTE: If these instructions differ from those packaged with
A93035
termination kit, follow kit instructions.
Combustion-air and vent pipes must terminate outside structure. A
factory accessory termination kit must be installed in 1 of the
installations shown in Fig. 34, 35, 36, 37, or 38. Four termination
kits are available.
27

Advertisement

Table of Contents
loading

Table of Contents