Electrical Connections - Ferroli PEGASUS F2 N T Instructions For Use, Installation And Maintenance

Cast iron gas boiler for central heating
Table of Contents

Advertisement

Pegasus F2 N T

2.5 Electrical Connections

Connection to the electrical grid
The boiler must be connected to a single-phase, 230 Volt-50 Hz electric line.
The unit's electrical safety is only guaranteed when correctly connected to an effi cient earthing
system executed according to current safety standards. Have the effi ciency and suitability of
the earthing system checked by professionally qualifi ed personnel. The manufacturer is not
responsible for any damage caused by failure to earth the system. Also make sure that the
electrical system is adequate for the maximum power absorbed by the unit, as specifi ed on
the boiler dataplate, in particular ensuring that the section of the system's cables is suitable
for the power absorbed by the unit.
The boiler is prewired and supplied with a connector located inside the control panel, arranged for
connection to an electronic thermostatic controller (see wiring diagrams in paragraph 4.5). In addition,
it is equipped with a three-pole cable for connection to the electricity line. The connections to the grid
must be made with a permanent connection and equipped with a bipolar switch whose contacts have
a minimum opening of at least 3 mm, interposing fuses of max. 3A between the boiler and the line. It
is important to respect the polarities (LINE: brown wire / NEUTRAL: blue wire / EARTH: yellow-green
wire) in making connections to the electrical line.
Access to the electrical terminal board and internal components of the
control panel
To access the electrical components inside the control panel, follow the sequence in fi g. 6 - 7 - 8 - 9.
The layout of the terminals for the various connections is given in the wiring diagrams in the
technical data chapter.
Fig. 6 - Unscrew the 2 self-tapped screws holding
the boiler cover.
Fig. 8 - Unscrew and take out the two screws and both
plates holding the control panel.
Fig. 7 - Lift by pressing upwards and take off the cover
that is held at the sides of the boiler by pins.
Fig. 9 - Turn the control panel forwards.
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents