Carrier 58UHV Installation, Start-Up, And Operating Instructions Manual page 28

Upflow/horizontal variable-speed, 2-stage induced-combustion gas furnaces sizes 060-120, series 110 and 120
Table of Contents

Advertisement

Checklist—Installation
LOAD CALCULATION
____________
Heating Load (Btuh)
____________
Cooling Load (Btuh)
____________
Furnace Model Selection
AIR FOR COMBUSTION AND VENTILATION
____________
Unconfined Space
____________
Confined Space
VENTING
____________
NFGC (United States)
____________
NSCNGPIC (Canada)
____________
Local Codes
____________
1/4-in. Upward Slope
____________
Joints Secure
____________
See Attached Vent Table Instructions
CHECKLIST—START-UP
Gas Input Rate
____________
(Set Within 2 percent of Rating Plate)
____________
Temperature Rise Adjusted
____________
Thermostat Anticipator Setting Adjusted or
____________
Thermostat Cycle Rate (3 cycles per Hr) Selected
CHECK SAFETY CONTROLS OPERATION
____________
Primary Limit
____________
Pressure Switches
____________
Draft Safeguard Switch
____________
Auxiliary Limit Switch(es)
THERMOSTATS
____________
Manufacturer
____________
Model Number
Copyright 1999 CARRIER Corp. • 7310 W. Morris St. • Indianapolis, IN 46231
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4
PC 101
Catalog No. 535-731
Tab 6a 8a
Printed in U.S.A.
Form 58UHV-4SI
Pg 28
7-99
Replaces: 58UHV-3SI
58uhv3si

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

58uxv58uxv series58uhv series

Table of Contents