Electrical Connections; 115-V Wiring; Accessories - Carrier 58UHV Installation, Start-Up, And Operating Instructions Manual

Upflow/horizontal variable-speed, 2-stage induced-combustion gas furnaces sizes 060-120, series 110 and 120
Table of Contents

Advertisement

GAS
SUPPLY
MANUAL
SHUTOFF
VALVE
(REQUIRED)
SEDIMENT
TRAP
UNION
Fig. 11—Typical Gas Pipe Arrangement
Table 4—Maximum Capacity of Gas Pipe*
NOMINAL
INTERNAL
IRON PIPE
DIAMETER
SIZE (IN.)
(IN.)
1/2
0.622
3/4
0.824
1
1.049
1-1/4
1.380
1-1/2
1.610
* Cubic ft of gas per hr for gas pressures of 0.5 psig (14-in. wc) or less, and a
supply line pressure drop of 0.5-in. wc (based on a 0.60 specific gravity gas).
Ref: Table 10-2, NFGC.
pressure test. If test pressure is equal to or less than 0.5 psig (14-in.
wc), turn OFF electric shutoff switch on gas valve before test. It is
recommended that ground joint union be loosened before pressure
testing. After all connections have been made, purge lines and
check for leakage with regulated gas supply pressure.
Step 6—Electrical Connections

115-V WIRING

Refer to the unit rating plate or Table 5 for equipment electrical
requirements. The control system requires an earth ground for
proper operation.
Do not connect aluminum wire between disconnect switch
and furnace. Use only copper wire.
Make all electrical connections in accordance with the National
Electrical Code (NEC) ANSI/NFPA 70-1999 and local codes or
ordinances that apply. For Canadian installations, all electrical
connections must be made in accordance with CSA C22.1 Cana-
dian Electrical Code, or authorities having jurisdiction.
A89417
LENGTH OF PIPE (FT)
10
20
30
40
175
120
97
82
360
250
200
170
680
465
375
320
1400
950
770
660
2100
1460
1180
990
The cabinet MUST have an uninterrupted or unbroken ground
according to NEC ANSI/NFPA 70-1999 and Canadian Elec-
trical Code, CSA C22.1 or local codes to minimize personal
injury if an electrical fault should occur. This may consist of
electrical wire or conduit approved for electrical ground when
installed in accordance with existing electrical codes. Do not
use gas piping as an electrical ground. Failure to follow this
warning could result in electrical shock, fire, or death.
The junction box can be moved to left-hand side of furnace when
a left-hand side power supply is desired. Remove 2 screws holding
the junction box. Mount junction box on left-hand side of furnace.
Holes have been provided in casing. When moved, tuck wiring
harness behind clip provided to keep extra wire lengths out of the
way.
NOTE: Proper polarity must be maintained for 115-v wiring. If
polarity is incorrect, the furnace control status LED will flash
rapidly and prevent heating operation.
24-V WIRING
Refer to ESD Precautions Procedure before proceeding with 24-v
connections.
Make field 24-v connections at 24-v terminal block. (See Fig. 12.)
Connect terminal Y/Y2 as shown in Fig. 13 or 14 for proper
cooling operation. Use only AWG No. 18 or larger, color-coded
copper thermostat wire.
The 24-v circuit contains an automotive-type, 3-amp fuse located
50
on main control. Any 24-v electrical shorts during installation,
73
service, or maintenance could cause this fuse to blow. If fuse
151
replacement is required, use ONLY a 3-amp fuse. The control will
285
flash code 24 when fuse needs replacement.
580
900
EAC - ELECTRONIC
AIR CLEANER
(115-VAC 1 AMP MAX)

ACCESSORIES

1. Electronic air cleaner (EAC)
A terminal block (EAC-1 [hot] and EAC-2 [neutral]) is
provided for EAC connection. (See Fig. 12.) The terminals are
energized with 115v, 1.0-amp maximum during blower motor
operation.
10
7
8
9
4
5
6
1
2
3
10 11
12
7
8
9
4
5
6
1
2
3
MASTER SLAVE
1
FURNACE AND
BLOWER OFF DELAY
SETUP SWITCHES
Fig. 12—Furnace Control
3-AMP
FUSE
LED -
DIAGNOSTIC
LIGHT
TWIN / TEST
TERMINAL
HUM -
HUMIDIFIER
(24-VAC 0.5
AMP MAX)
24-VOLT
THERMOSTAT
TERMINALS
A95231

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

58uxv58uxv series58uhv series

Table of Contents