Installation Section – Page 8
Because the pipework connections are behind the boiler backplate, short lengths of pipe should be connected to the
appropriate tappings before the boiler is lifted into position, and terminated just clear of the boiler for connecting to
the system pipework. It is recommended that capillary fittings are used.
FIG. 4 MOUNTING FEATURES
(Flamingo RS4O illustrated)
Page 8
Installation Section – Page 9
A Combined Gravity System
RS5OS
1. Connect a suitable length of 28mm pipe with 90º elbow to either the R.H. or L.H. 1" B.S.P. rear facing flow
connections. (Hot water)
2. Connect a suitable length of 22mm pipe with 90º elbow to the remaining 1" B.S.P. rear facing flow connection.
(Central heating)
3. Connect a suitable length of 28mm pipe with 90º elbow to either the R.H. or L.H. 1" B.S.P. rear facing return
connections. (Hot water)