4.2 Package list
See assembly instructions
4.3 Mounting
PHRASE NON TRADUITE : 55086.
4.3.1
Main dimensions
540
1805
1566
150
(1)
Burner centre line
(2)
The lateral control panel can be mounted to the right or left of
the boiler. Exact height positioning defined by the fitter during
assembly.
(3)
max
17/04/2012 - 300029103-001-01
6
291
Heating flow - Ø E (weld)
Heating return - Ø E (weld)
Draining - Mk3/4
Flow switch
Minimum height for sweeping = 850
2" tapped sludge removal hole
NXR5i
240
150
C003927-C
11