Handling the boiler
Note
Observe all relevant accident prevention
regulations.
Only use the marked fixing points.
1. Lifting the boiler
Use lifting eyes A or lifting area D
on the boiler support.
Lifting eyes A:
Tie-down points B for IPB
120:
2. Moving the boiler
For this, fit steel rollers underneath
base rail C.
3. Secure the pulling equipment to the
tie-down points B.
F1/2
A
F1/2
D
7 80
Note
7 ≤60
Boiler shown with an optional integral
economiser.
F1/2
C
B
F1/2
D
5