Fitting The Test And Control Equipment - Viessmann VITOMAX 200-HS M73A Installation Instructions Manual

Oil/gas high pressure steam boiler
Table of Contents

Advertisement

Connecting the boiler on the steam side
Boiler connections (cont.)
Boiler size
Steam connector
for permiss. operating pressure
6 bar
8 bar
10 bar
13 bar
16 bar
18 bar
20 bar
22 bar
25 bar
Safety valve connector
for permiss. operating pressure
6 bar
8 bar
10 bar
13 bar
16 bar
18 bar
20 bar
22 bar
25 bar
Feedwater connector
for permiss. operating pressure
6-25 bar

Fitting the test and control equipment

Fit test and control equipment that is
pressure tested to the same level as the
operating pressure of the boiler and that
is suitable for the intended operating
mode (operation with or without constant
supervision). Agree details with the
responsible approval body, which should
also approve them.
(cont.)
6
PN 16 DN
125
PN 16 DN
100
PN 16 DN
80
PN 40 DN
PN 40 DN
80
PN 40 DN
65
PN 40 DN
65
PN 40 DN
65
PN 40 DN
65
PN 40 DN
50
PN 40 DN
40
PN 40 DN
32
PN 40 DN
32
PN 40 DN
25
PN 40 DN
25
PN 40 DN
20
PN 40 DN
20
PN 40 DN
20
PN 40 DN
20
PN 40 DN
32
Note
Carry out the installation in accordance
with the instructions supplied with the
equipment.
For the electrical connection, see the
connection and wiring diagrams provi-
ded.
7
8
9
125
150
150
100
125
150
100
125
125
80
100
100
80
80
100
65
80
100
65
80
80
65
65
80
65
65
80
40
50
50
40
40
50
32
40
40
32
32
40
25
32
32
25
32
32
25
25
32
25
25
32
20
25
25
32
32
32
11