Boiler handling, positioning and adjustment
Lifting eyes for securing lifting tackle
have been welded to the top of the
boiler.
1. Remove the transport timbers
from the bottom of the boiler.
2. Insert adjustable feet (inside the
bag on the bottom of the boiler)
from the top into the foot rails.
3. Level the boiler using the
adjustable feet.
Please note
We recommend the installation of
the boiler on anti−vibration
supports.
5