B-4
2
3
4
5
6
OPERATION
CASE BACK CONTROLS
(See Figure B.2)
1. ETHERNET
2. GAS INLET (OPTIONAL)
3. RESERVED FOR FUTURE DEVELOPMENT
4. SYNC TANDEM (OPTIONAL)
5. REAR ARCLINK (OPTIONAL)
6. DEVICENET (OPTIONAL)
7. COOLER OUTPUT POWER PANEL (OPTIONAL)
8. INPUT POWER CORD
9. CIRCUIT BREAKER
FIGURE B.2
9
POWER WAVE
S500CE
®
B-4
1
7
8