Operation Sequence
1. Combustion fan purges heat chamber, PCB
verifies fan rotation
2. Ignition spark begins
3. When sensing electrode detects spark, gas
valve assembly opens
4. Ignition occurs and heat exchanger warms
5. Spark stops as flame rod & PCB verify flame
6. When heat exchanger is warm enough,
convection room blower circulates warm air
into the structure.
7. When filled, the humidifier tray ensures the
air is not too dry (if needed)
8. Thermistor & PCB determine gas and fan
settings
9. When temperature set point is
reached, if needed, gas valves close &
combustion fan stops. Convection fan
continues to run to cool down unit.
10.When temperature drops, process starts over

Direct Vent Furnaces

®
Concentric Termination
Convection Fan
Heat Exchanger
Humidifier Tray
Flame Rod
Combustion
Fan
POV
SV1 & 2
Spark and sensing
electrodes
Thermistor
PCB
12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents