Initialization - TP-Link T3700G-28TQ Installation Manual

Jetstream stackable l3 managed switch
Hide thumbs Also See for T3700G-28TQ:
Table of Contents

Advertisement

315

Initialization

After the device is powered on, it begins the Power-On Self-Test. A series of tests
run automatically to ensure the device functions properly. During this time, its LED
indicators will respond as follows:
The Power LED indicator will light on all the time.
After keeping off for several seconds, the rest of the LED indicators will flash
momentarily, and then work as the table in 1.2 Appearance shows after the
initialization.
Stackable L3 Managed Switch
22
Connection

Advertisement

Table of Contents
loading

Table of Contents