NA-168VX2/168VG2/148VA2/128VA2/147VB2
Description
13 Replacement
of the wringer
frame packing
14 Replacement
of the balance
weight upper front
15 Replacement
of the balance
weight lower front
16 Replacement
of the outer tub
cover
Figure
After remove the body B
1.Remove the body band B fixing the wringer frame
packing by using 2 long nose pliers.
2.Remove the wringer frame packing.
Note:
Incase to mounting the wringer frame packing A,
cutting portion shall be set to the marking portion
of the outer tub cover.
After remove the body B and wringer frame packing
1.Remove 3 bolts by the spanner (size 10mm).
2.Pull out the Balance weight to remove.
After remove the body B and wringer frame packing,
1.Remove the 3 bolts by the spanner (size 13mm).
Note:
Use gloves in case to remove the bolts.
After remove the body B, wringer frame packing
and both balance weights
1.Remove 3D sensor.(See page-28 replacement of
the 3D sensor)
2.Remove the shower hose, and the sub hose from
the detergent case A.
-34-
Procedure