Disable Schedule; Run The Schedule - Pandigital PAN7000DW User Manual

Hide thumbs Also See for PAN7000DW:
Table of Contents

Advertisement

mode throughout the weekend. The following Monday morning, the
DPF would resume operation at 8:30am.
CALENDAR/CLOCK
1. On the
Set Schedule
2. Select
3. Use
field values in
4. To set the
Schedule
5. Use
field values in
6. When correct times are set, select
screen.

Disable Schedule

After the schedule has been set (per above instructions), you can
disable the schedule whenever desired.
CALENDAR/CLOCK
1. On the
Set Schedule
2. Select
Schedule
will display
Done
3. Select
EXIT
4. Press

Run the Schedule

After the schedule times have been set (per above instructions), you
Run Schedule
will use the
to take effect.
There are two methods for running the schedule, either from a
slideshow or from the
CAUTION: After you select the
.
to move between the fields and
Weekdays On/Off
Weekends On/Off
button, and then use
to move between the fields and
Weekends On/Off
, and then select the
Enable Weekends Schedule
or
OFF
.
.
to return to the previous screen.
function whenever you want the schedule
CALENDAR/CLOCK
intervention will cancel the activation (i.e., pressing
remote or control button, powering off) and the schedule
will not take effect until you select this function again to
re-activate.
MENU
screen, press
.
Enable Weekends
, select the
to access the settings.
.
Done
to return to the previous
MENU
screen, press
Enable Weekdays
button. The time fields
screen.
Run Schedule
.
to change the
to change the
.
function, any user
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pan9000dw

Table of Contents