Specification; Installation - Cornelius C10 Product Manual

Overcounter dispense units
Table of Contents

Advertisement

C10/C20 Manual

3. SPECIFICATION

For a full and detailed specification refer to the product data sheet.
DIMENSIONS
Height (nominal):
Height (inc tap):
Width:
Depth (nominal):
Depth (inc drip tray):
Weight (operating):
Water bath capacity:
PERFORMANCE
Ice bank weight
Electrical: See rating plate located on the cooler (or product data sheet) for the electrical rating of this
cooler.

4. INSTALLATION

Installation to be carried out by a suitably trained person only. Compliance with local Bylaws and
Codes of Practise must be ensured.
To ensure trouble free operation it is essential that the unit is installed correctly and sanitised prior to use.
1.
The cooler should be sited on a firm level surface, in a well ventilated position, and at a maximum
distance of 2 meters from an electrical supply. To ensure efficient and reliable operation of the
refrigeration system allow 75mm clearance around the unit and that there is an un-impeded flow
of air to and from the condenser grilles. Allow for future access to the lid and service panels.
2.
If not already fitted, fit the appropriate electrical plug to the service cord. Consult local Electrical
legislation for correct method of Installation.
WARNING - THIS APPLIANCE MUST BE EARTHED
Do not connect the cooler at this point.
3.
Remove the lid and filler cap (as appropriate) and fill the bath with cool, clean, water until the
water flows from the overflow into drip tray. Do not use de-ionised water or add any substance
to the water. Do not leave hose pipes unattended whilst filling the water bath – the overflow will
not remove water quickly enough. Once filled with water do not move the unit.
4.
Ensure that all covers and access panels are screwed in place.
5.
Ensure that the cooler is electrically safe. The cooler may now be electrically switched on to
allow it to cool whilst the rest of the Installation is completed.
The cooler will displace water through the overflow as it forms its ice.
6.
Electrically isolate the cooler. Connect the beer inlet line and check for leaks before completing
the installation.
7.
Sanitise the unit – see User instructions.
8.
Electrically switch the unit on.
9.
The system is now ready for operation but will not give best results until the ice bank is fully formed.
C10
C20
465mm
500mm
500mm
275mm
375mm
460mm
585mm
580mm
705mm
41kg
60kg
14 litres
24 litres
7 kg
11kg
3
®

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

C20

Table of Contents