Removing The Primary Sheave; Removing The Secondary Sheave And V-Belt - Yamaha YW125Y 2009 Service Manual

Hide thumbs Also See for YW125Y 2009:
Table of Contents

Advertisement

2
3
1
3
2
3
EAS00317

REMOVING THE PRIMARY SHEAVE

1. Remove:
1
2. Remove:
TIP
While holding the primary fixed sheave with the
rotor holding tool 3, loosen the primary fixed
sheave nut.
EAS00318
REMOVING THE SECONDARY SHEAVE AND
V-BELT
1. Remove:
TIP
While holding the clutch housing with the sheave
2
holder 3, loosen the secondary sheave nut.
2. Loosen:
NOTICE
Do not remove the clutch carrier nut at this
stage.
1
5-43
BELT DRIVE
8 V-belt case
8 Refer to "V-BELT CASE".
8 primary fixed sheave nut 1
8 plate washer
8 oneway clutch
8 primary fixed sheave 2
Rotor holding tool
90890-01235 (YU-01235)
8 secondary sheave nut 1
8 clutch housing 2
Sheave holder
90890-01701 (YS-01880-A)
8 clutch carrier nut 1
ENG

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents