LDC Racing Saliboats RS FEVA Owner's Manual page 34

Table of Contents

Advertisement

towards the back of the boat.
3) Thread the
mainsheet
the
block
at the back end of the boom.
4) Thread the
mainsheet
mainsheet
back up to the end of the boom, and thread it through the metal eye
on the end of the
in the end of the mainsheet.
5) Unroll the mainsail.
6) Take the end of the
(not from the cleat), and tie it to the top of the
7) Put the top of the
above the
gooseneck mast
8) Holding the
sail
9) Pull the
mainsail
keep it in line with the mast, especially when passing the
10) When the
mainsail
been pulling around the outside of the shroud, and pull it forward.
11) Pull the
halyard
of the mast.
12) Once the
halyard
13) Take the
Inglefield Clip
14) Clip the
Inglefield Clip
15) Pull the
halyard
through the webbing strap (with the outhaul), and through
through the
boom
to which the
Picture 4.19 RS Feva 2:1 Mainsheet
main halyard
that comes down the
mainsail
into the opening at the bottom of the
collar.
in line with the mast, pull on the other end of the
up to the top of the mast. To make
is at the top of the mast, lead the
towards the back of the boat, until it locks in the
is cleated, bring it back around the shroud.
and thread the end of the
on to the one attached to the elastic by the
through the
Inglefield Clip
block
on the
mainsheet
block
is attached. Tie a single overhand knot
mast
mainsail
hoisting
halyard
halyard
until all the slack has been taken up.
bridle. Lead the
from the bullseye
using a
knot on
knot.
mast
track, just
main
halyard.
the
mainsail
batten
pockets.
tail that you have
cleat
at the top
through the hole.
mast
gate.
easier,

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents