Lifting Method - LG universal system air conditioner Service Manual

Universal system air conditioner
Hide thumbs Also See for universal system air conditioner:
Table of Contents

Advertisement

8.2 Settlement of outdoor unit
• Anchor the outdoor unit with a bolt and nut(ø10mm) tight-
ly and horizontally on a concrete or rigid mount.
• When installing on the wall, roof or rooftop, anchor the
mounting base securely with a nail or wire assuming the
influence of wind and earthquake.
• In the case when the vibration of the unit is conveyed to
the hose, secure the unit with an anti-vibration rubber.
AUUW4860 [UU48 WUYB]/AUUW6060 [UU60 WUYB]
Example of collective installation

8.3 Lifting Method

• When carrying the unit suspended, pass the ropes
under the unit and use the two suspension points each
at the front and rear.
• Always lift the unit with ropes attached at four points so
that impact is not applied to the unit.
• Attach the ropes to the unit at an angle of 40° or less.
• Use two ropes at least 7 m long.
Caution:
Be very careful to carry product.
• Do not have only one person carry product if it is more than 20 kg.
• PP bands are used to pack some products. Do not use them as a mean for transportation because they are
dangerous.
• Do not touch heat exchanger fins with your bare hands. Otherwise you may get a cut in your hands.
• Tear plastic packaging bag and scrap it so that children cannot play with it. Otherwise plastic packaging
bag may suffocate children to death.
• When carrying in outdoor unit, be sure to support it at four points. Carrying in and lifting with 3-point support
may make outdoor unit unstable, resulting in a fall of it.
Installation foot
250
500±2
556
Bolt
Individual installation
250
500±2
556
A
40° or less
Rope suspension part
B
MPS Inverter SINGLE A
Tubing connection
500±2
500±2
Service Manual 93