Heat & Glo SL-750TRS-C Installer's Manual page 20

Table of Contents

Advertisement

Flex Vent
The flex vent must be supported with the spacing between
support intervals not exceeding 4 feet, with no more than ½
inch sag between supports.
A support is required at each change in venting direction,
and in any location where it is necessary to maintain the
necessary clearance to combustibles. A simple "up and out"
installation (Figure 9) requires only enough support to main-
tain the necessary clearance to combustibles. However, the
vent attachment point and the firestop location are consid-
ered to be supports.
3" CLEARANCE
FLEX-VENT
Figure 9.
STRAIGHT OUT HORIZONTAL VENTING
Max. Run
36" (914 mm)
Use DVP-Series
components only.
Figure 11. Straight Out Horizontal Venting
TERMINATION
CAP
1"
CLEARANCE
H
H
STRAIGHT UP
VERTICAL VENTING
V (FT.)
45' MAX.
NOTE: For vertical venting
over 20 feet a restrictor
plate is recommended for
improved flame appearance.
Use SL D-Series
components only.
Figure 10.
Straight up Vertical Venting
90-DEGREE
ELBOWS
Use two 90
0
elbows for corner installations.
The use of two 90
tion will affect space requirements (see Fig. 4)
20
CAP
0
elbows in a corner installa-
V

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl-550trs-cSl-350trs-c

Table of Contents