Vent Termination Clearances - Superior DRT63STTEN Installation Instructions Manual

Signature series see-through direct-vent gas fireplaces
Table of Contents

Advertisement

INNOVATIVE HEARTH PRODUCTS • SEE-THROUGH DIRECT-VENT GAS FIREPLACES (DRT63STTEN / DRT63STTEP) • INSTALLATION INSTRUCTIONS
VENT TERMINATION
CLEARANCES
These instructions should be used as a guide-
line and do not supersede local codes in any
way. Install venting according to local codes,
these instructions, the current National Fuel
Gas Code (ANSI-Z223.1) in the USA or the cur-
rent standards of CAN/CSA-B149.1 in Canada.
Vertical Vent Termination Clearances
Terminate multiple vent terminations accord-
ing to the installation codes listed above. Also
see Figure 3A.
Terminate single vent caps relative to building
components as shown in Figure 3B.
12 in
(305 mm)
minimum
Figure 3A : Multiple Terminations
6
TERMINATION HEIGHTS FOR VENTS ABOVE
FLAT OR SLOPED ROOFS
Horizontal Overhang
2 FT MIN.
Discharge
Vent
Opening
Termination
H*
Storm Collar
Flashing
1 inch (25.4 mm) Minimum
Clearance to Combustibles
Concentric
*H = MINIMUM HEIGHT FROM ROOF TO
Vent Pipe
LOWEST DISCHARGE OPENING OF VENT
*h = minimum height from roof to lowest
discharge opening of vent.
Figure 3B: Vertical Vent Termination Clearances
horizontal Vent Termination Clearances
The horizontal vent termination must have a minimum of 3 in (76 mm) clearance to any overhead
combustible projection of 2-1/2 in (64 mm) or less (see Figure 4). For projections exceeding
2-1/2 in (64 mm), see Figure 4. For additional vent location restrictions refer to Figure 5 on Page 7.
Combustible
Projection
extending more
than 2.5 inches
24 in
(610 mm)
Horizontal Termination Kit
Horizontal Vent Termination Clearances
For recess allowances of square horizontal termination into exterior walls,
see Figure 30 on Page 20.
Figure 4
Vent/air intake termination clearances
above the high side of an angled roof
are listed in the table below.
2 FT
Vertical
Termination heights for Vents
MIN.
Wall
Lowest
(Ref. NFPA 54 / ANSI Z223.1)
Flat to 6/12
6/12 to 7/12
X
12
7/12 to 8/12
Roof Pitch is X/12
8/12 to 9/12
9/12 to 10/12
10/12 to 11/12
11/12 to 12/12
12/12 to 14/12
14/12 to 16/12
16/12 to 18/12
18/12 to 20/12
20/12 to 21/12
3 in
(76 mm)
Side Elevation View
Ventilated or Unventilated Soffit
Above Flat or Sloped Roofs
Roof Pitch
*Feet
*Meters
1.0
0.3
1.25
0.38
1.5
0.46
2.0
0.61
2.5
0.76
3.25
0.99
4.0
1.22
5.0
1.52
6.0
1.83
7.0
2.13
7.5
2.29
8.0
2.44
Combustible
Projection
extending up
to 2.5 inches

Advertisement

Table of Contents
loading

This manual is also suitable for:

Drt63sttep

Table of Contents