Rotating Elbow For Horizontal Terminations; Flueing Arrangements - Horizontal Terminations; Flueing Arrangements - Vertical Terminations; Restrictor Position - HAMPTON BAY HG35-NG1 Owners & Installation

Direct vent gas fireplace
Table of Contents

Advertisement

INSTALLATION
ROTATING 45
1) Remove all 4 screws that secure
the elbow to the unit using a 1/4"
magnetic nut driver.
Remove all 4 screws
and washers
Horizontal Terminations for All
Flueing Systems
The shaded areas in the diagram below show
all allowable combinations of vertical runs
with horizontal terminations. Maximum one
90
O
elbow (two 45
o
elbows equal one 90
elbow).
ULPG,LPG and Natural Gas:
Residential, Manufactured and
Mobile Homes Installations
The fl ueing arrangements diagrammed below,
have a min. of 75% (fl ue loss) effi ciency with Fan
Off, as required for manufactured homes. (Actual
effi ciency may be as high as 85%)
May be installed in Manufactured (Mobile)
Homes after fi rst sale.
10'(3.0m)Max.
5'(1.5m)
Min.
22
1'(0.3m)
20
18
16
14
Restrictor
Position
12
(A)
10
8
6
4
3'
2
(0.9m)
Horizontal Run (Feet)
10
O
ELBOW FOR STRAIGHT HORIZONTAL TERMINATIONS
FLUEING ARRANGEMENTS
The shaded area in the diagram below shows all allowable combinations of straight verti-
cal and offset to vertical runs with vertical terminations. Maximum two 45
o
If the fl ue is ENCLOSED in a chase (min. size 9" (229mm) x 9" (229mm)) maintain a 1-1/4"
(32mm) clearance to combustibles.
1
1
2) Rotate the elbow 180
3) Secure the elbow by securing
it with the 4 screws.
Vertical Terminations Using
Dura-Vent Flueing System for
Residential Manufactured and Mobile Homes
May be installed in Manufactured (Mobile) Homes after fi rst sale.
Offset to Vertical Terminations
Hampton HG35-1 Direct Vent Freestanding Gas Stove
o
o
elbows.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hg35-lpg1

Table of Contents