Sanyo Big PACi 18 Series Technical Data & Service Manual page 95

Big pack i dc inverter
Table of Contents

Advertisement

1
1-4. Dimensional Data
(B) Outdoor Unit: SPW-C706VH8
170
105
Air
intake
Anchor bolt
Bottom removable connection port
2 x o32 holes (holes for drain)
Of the 4 o32 holes , use 1 of the 2 holes specified
for drain use to install the port.
Use rubber plugs to seal the remaining 3 holes.
660
110
Air
60
intake
13
219
75 75
B
13
Air discharge
940
22
5
6
7
8
60
8
57
Anchor bolt
A
49
61
Anchor bolt
VIEW A
1
340
2
Air
3
discharge
22
42
42
49
49
Anchor bolt
4
85 64
5.5
62
49
VIEW B
Refrigerant tubing connection port
1-90
Unit:mm
Mounting hole (4-R6.5),
1
anchor bolt : M10
Refrigerant tubing (liquid tube),
2
flared connection (o9.52)
Refrigerant tubing (gas tube),
3
flared connection (o19.05)
4
Refrigerant tubing port
5
Electrical wiring port (o16)
6
Electrical wiring port (o19)
Electrical wiring port (o29)
7
8 Electrical wiring port (o38)
Name
Figure
Reducing Joint Tube
(o19.05
o25.4)
Joint Tube (o19.05)
Remark:
There are two types of supplied tubings.
The one tubing port o19.05 (flare process) is
connected to the flared connection of the gas
port side's service valve. The other "L" shaped
tubing port is brazed in connection after cutting
the tube at the proper length. Then make a
brazing connection to the main tubing (o25.4).
Air intake
5
6
7
8
4
60
33
3
7
5
52
60
6
8
4
7
59
Anchor bolt
Q'ty
1
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents